Design
We take a pragmatic and practical engineering approach towards our design obligations; an example being our MRI room design norms whereby:
- Ceiling access panels are normally fitted
- The Faraday cage panels have high integral strength
- The roof is (i) normally suspended from the building’s structure and (ii) capable of supporting the full weight of a man moving about
The policy at EEP is always to seek new ways and means to improve our products; for example, to give our MRI rooms’ greater quietness, we regularly review developments in sound insulation materials.
As a pre-cursor to preparing installation drawings EEP will, when possible, undertake a site survey to augment any client supplied information. Our designs also allow for the results of any site vibration and magnetic field tests.
Installation & Project Management
The highly technical nature of the work requires understanding the physics involved in addition to knowledge of electrical engineering and building construction techniques and practices. This calls for the design and installation teams to have a wide knowledge base as well as a high skill base.
Good shielding solutions require a constant application of care and attention to detail – particularly around doors and openings to ensure the efficacy of the installation is not compromised.
EEP has its own installation teams and supervisors who are skilled, multi-disciplined employees, specifically selected and trained. This is paramount as we have to work with a variety of materials each with their own unique handling peculiarities requiring specific installation techniques.
Projects are closely monitored both on site and at Head Office so that we can tailor the programme and work load to meet the dynamics of the site and agreed critical dates.
top of page
|