 |
|
|
| The Supporting Package Quality & Testing |
|
|
 |
| |
Quality & Testing
Monitoring site work – rigorous procedures are enforced to ensure the construction quality is maintained at a consistently high level. This is paramount for radiation shielded areas where strict health physics rules apply.
Installation performance testing – for MRI rooms and other RF shielded facilities this is an in-house activity conducted by EEP staff. For ionising radiation shielded areas, any active testing is normally the responsibility of the user but EEP can undertake this if required.
Accreditation – we operate a Quality Management System complying with International Standard BS EN 9001: 2008. EEP is approved by the British Standards Institution, Certificate No. FS 38901. Our license scope states:
‘The design, assembly, installation, servicing and testing of R.F. shielded structures and equipment including EMI shielding and thermal management materials, gas tight doors and specialised mobile electromagnetic pulse protection (E.M.P.P.) containers. Radio Frequency, magnetic shielding and quench systems for MRI (Magnetic Resonance Imaging) scanners. The design, assembly and installation of ionising radiation protection facilities.’ |
Click here to see our certificate.
top of page |
 |
|